From Jim Baillon


 PHOTO (in gallery above) SHOWS INTERIOR CIRCUIT DISCHARGE AFTER CHEMICAL APPLICATION

SYSTEM IS BEING DRAINED AND NEW WATER ADDED -WHEN WATER LOOKS CLEAN THEY WILL STOP THE REFILL DISCHARGE PROCESS . ANOTHERPHOTO SHOWS INSTALLATION OF 2 NEW 1/4 SHUT OFF VALVES  (RED HANDLES), THE FLOW BALANCING VALVE  AND THE THERMOSTATICALLY CONTROLLED SHUTOFF VALVE.
THIS IS UNIT 104 AND THE INSTALLER WAS COLLECTING DISCHARGE SAMPLES AS WELL AS MONITORING FOR PARTICLES IN THE DISCHARGE. ALL NEW VALVE SYSTEMS FOR BUILDING 1 AND 2 ARE INSTALLED AWAITING FOR COOLING TOWER TO RETURN TO SERVICE BEFORE BEING COMMISSIONED BY IVAN MASCOTE.
 
(Editors Note:  I can’t seem to make this web site do what I want it to do. I apologise the photos are jumbled, but its the best I could do.  What amazing photos!)
 